Electricity: technician opposed stop Nasiriyah station work DinarDailyUpdates?bg=330099&fg=FFFFFF&anim=1

Electricity: technician opposed stop Nasiriyah station work

Go down

Electricity: technician opposed stop Nasiriyah station work Empty Electricity: technician opposed stop Nasiriyah station work

Post by RamblerNash Sat Jun 11, 2016 10:23 am

Electricity: technician opposed stop Nasiriyah station work

Sat, 11 Jun 2016 13:20:06

Observer news / Baghdad
The Ministry of Electricity, Saturday, for Nasiriyah thermal station stops in Dhi Qar province to work, and attributed the cause to "operational technician opposed", and as pointed out that this stop causing the loss of 490 MW of the national electricity system.

A spokesman for the Ministry of Electricity Musab teacher "The exhibitors technically operational happened in the heat of Nasiriyah station in Dhi Qar province led to the station stopped working and the loss of energy of $ (490 MW) of the national electricity system," noting that "work is underway to restart the units of the station during the next few hours down to five in the afternoon for the return of the system clock to normal. "

He said the teacher, that "the city of Nasiriyah has fed with electric power from the two lines for the transfer of energy from outside the province until the return of Nasiriyah Thermal Power Station to the service with a capacity (460 MW) and thus run gas Nasiriyah station with a capacity (30 MW)."

He continued, "The engineering and technical staff in the station was intending this morning, Friday, the introduction of a converted new Alooto to increase the stability of the thermal station work and enable them to move their production entirely to the power transmission lines and then on to the system, and event technical viewer operational this," and expressed, hope "bypassing this stop in the next few hours."

The teacher, that "the national electricity system is witnessing a marked improvement weeks ago, where production amounted to (13,500) MW," noting that "the hours of processing in the capital Baghdad and the provinces satisfactory, especially since there are new energies obstetric will enter into service in the next couple of weeks will raise productivity and increase of hours of processing. "

LINK
RamblerNash
RamblerNash
GURU HUNTER
GURU HUNTER

Posts : 24162
Join date : 2015-02-19

View user profile

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum