Dinar Daily
Welcome to Dinar Daily Discussions.

Logging in with your USERNAME allows you to participate in discussions, see what has recently been posted, and other options. Guests can post but they do have limited abilities.

We are NOT a guru forum. We are a dinarian forum. The opinions expressed on the forum do not reflect the of opinion of Dinar Daily specifically, but rather reflect the views of the individual posters only.

Disclamer:

We are in compliance with, "Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use."


Get Daily Updates of the NEWS & GURUS in your EMAIL
CHECK YOUR EMAIL for VERIFICATION

Enter your email address:

Petronas plans to operate three new excavators in the Gharraf field DinarDailyUpdates?bg=330099&fg=FFFFFF&anim=1

Buy and Sell

Petronas plans to operate three new excavators in the Gharraf field

Go down

Petronas plans to operate three new excavators in the Gharraf field Empty Petronas plans to operate three new excavators in the Gharraf field

Post by claud39 on Sun May 19, 2019 9:17 am

Petronas plans to operate three new excavators in the Gharraf field




05/19/2019



Petronas plans to operate three new excavators in the Gharraf field 15239







Economy News Baghdad:



Malaysia's Petronas Company, which operates in the Gharraf oil field in Dhi Qar province, has announced its intention to study and evaluate three scenarios for different contractors, including the operation of three drilling machines synchronously at one well in the field.

"If implemented effectively, it will be the first of its kind in Iraq, and a new success story for Petronas in the Ghraf operations," said Azral Abdul Rahim, the company's drilling manager.

He added that "2018 had witnessed the completion of Petronas Algraf, as the company succeeded in connecting seven wells in a single well by successfully running two drilling systems simultaneously, after the operation of two diggers in one site, adding a new addition to the concept of drilling in Iraq.

He explained that "Petronas is proud to remember that the Iraqi Drilling Company was the first in the implementation of this concept has succeeded in connecting all wells planned between them
In August 2018, the Great Wall Drilling Company ( GWDC ) was the second drilling contractor to carry out the simultaneous drilling at a single well platform. Five additional wells were delivered in the same year, raising production rates to more than 5,000 barrels per day, in addition, also initiated work on my computer two other drilling by the group "Chungman" oil and natural gas ( ZPEC ) and who work simultaneously in the excavation area ( WPK ) from the beginning of the first quarter of this year.

"The drilling process did not speed up the delivery of wells, which led to increased production, but also increased the efficiency of local contractors, which led them to become highly qualified contractors," the company said in a report.

"For the successful implementation of this principle, which is the first of its kind, Petronas intends to replicate it in other locations within the oil field of Gharraf."

"As a professional operator, it is considered to be its largest source of personnel, so it places excellence, safety and environment as its top priority, taking into account the risks of drilling, such as drilling rigging due to concurrent drilling, Separators during operation, to ensure the safety of all employees. "
Petronas is committed to the plan of action to achieve the goal of producing a peak of 230 thousand barrels per day in the field of oil Gharraf by the fourth quarter of 2020, and with innovative techniques, the company is confident of its ability to fulfill its promise to the Iraqi government.



claud39
claud39
VIP Member
VIP Member

Posts : 10541
Join date : 2018-11-04

Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum