Dinar Daily
Welcome to Dinar Daily Discussions.

Logging in with your USERNAME allows you to participate in discussions, see what has recently been posted, and other options. Guests can post but they do have limited abilities.

We are NOT a guru forum. We are a dinarian forum. The opinions expressed on the forum do not reflect the of opinion of Dinar Daily specifically, but rather reflect the views of the individual posters only.

Disclamer:

We are in compliance with, "Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use."


Get Daily Updates of the NEWS & GURUS in your EMAIL
CHECK YOUR EMAIL for VERIFICATION

Enter your email address:

The industry is implementing a plan to increase production capacity with salmawa to 500 thousand tons per year DinarDailyUpdates?bg=330099&fg=FFFFFF&anim=1

The industry is implementing a plan to increase production capacity with salmawa to 500 thousand tons per year

Go down

The industry is implementing a plan to increase production capacity with salmawa to 500 thousand tons per year Empty The industry is implementing a plan to increase production capacity with salmawa to 500 thousand tons per year

Post by claud39 on Wed May 08, 2019 7:48 am

The industry is implementing a plan to increase production capacity with salmawa to 500 thousand tons per year


05/08/2019





The industry is implementing a plan to increase production capacity with salmawa to 500 thousand tons per year 15023







Economy News _ Baghdad



The company that invests in the saline of Samawah has been able to increase the production capacity of the saline of Samawa after implementation of the paragraphs of the plan of rehabilitation, modernization and development of saline according to the conditions stipulated in the investment contract. 

The owner of the saline, Sultan Ali Sultan, said in a statement to the ministry, "The Economy News" a copy of it, "The investor company has added five ponds with an area of ​​(160) thousand square meters and rehabilitation of low saline containing rock salt the basic material, to produce salt and digging new channels With a length of more than (15) kilometers for the purpose of collecting the largest amount of salt solutions and access to the design capacity of (500) thousand tons per year.

He explained that "the low salt feed through the drilling of artesian wells and the installation of water pumps with a capacity of (500) cubic meters / hour per pump, which works to dissolve the rock salt located in the low and when the water in the low to the concentration (23 or 24) Concentration of salinity) These solutions are reduced to sedimentation ponds to be prepared for precipitation by solar evaporation in the summer season to be later harvested by hydraulic excavators and transported to salt washers to rid them of impurities such as sulphates, ) Sodium chloride salt It becomes ready industrial salt washed Negotiable processing to government and private laboratories. "

Sultan reviewed "the rehabilitation, modernization and development work carried out by the company invested to raise the production and upgrading salty condition, including the packaging of channels linking the low earth and the feeding channel to the ponds with stone and cement mortar length of 150 cubic meters and feed the same channel (2500) meters to be ready for the flow of salt solutions inside (6) buildings for the purpose of exploiting the workers and processing (2500) rubber pulleys as the main conveyor belt and purchase (1000) meters rubber belt width of one meter for the purpose of transporting salt from the washing machine to the unit of Master. "

For his part, the head of engineers Amer Abbas Ali said that "the investor company has equipped salted diesel pumps number (10) and placed on wells dug to feed the low salt water and equipped with heavy equipment and light amounted to (12) is prepared as the company began digging the foundations of the roof of the mill and warehouses area (1000) (500) square meters and work on the establishment of a special garage for the area of ​​(600) square meters and the introduction of the five docks added twice the size of the area (160) thousand square meters with existing docks to achieve design energy, "asserting that" Rehabilitation, modernization and development work completed According to the agreed specifications under the investment contract. "



claud39
claud39
VIP Member
VIP Member

Posts : 11178
Join date : 2018-11-04

Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum