Dinar Daily
Welcome to Dinar Daily Discussions.

Logging in with your USERNAME allows you to participate in discussions, see what has recently been posted, and other options. Guests can post but they do have limited abilities.

We are NOT a guru forum. We are a dinarian forum. The opinions expressed on the forum do not reflect the of opinion of Dinar Daily specifically, but rather reflect the views of the individual posters only.

Disclamer:

We are in compliance with, "Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use."


Get Daily Updates of the NEWS & GURUS in your EMAIL
CHECK YOUR EMAIL for VERIFICATION

Enter your email address:

Lukoil begins phase 2 development of West Qurna-2 field in Iraq DinarDailyUpdates?bg=330099&fg=FFFFFF&anim=1

Buy and Sell

Lukoil begins phase 2 development of West Qurna-2 field in Iraq

Go down

Lukoil begins phase 2 development of West Qurna-2 field in Iraq Empty Lukoil begins phase 2 development of West Qurna-2 field in Iraq

Post by GirlBye on Fri Feb 08, 2019 11:13 am

Russian oil and gas firm Lukoil started drilling of new production wells at West Qurna-2 field as part of the onshore Iraqi field’s second phase development.

Lukoil begins phase 2 development of West Qurna-2 field in Iraq 326319
Image: Lukoil begins drilling New production wells at West Qurna-2 field. Photo: courtesy of LUKOIL.


Last year, Lukoil and Basra Oil signed a new development plan of West Qurna-2 field with an aim to increase its production to 480 thousand barrels per day by 2020 and to achieve production plateau of 800 thousand barrels per day in 2025.
The current production from the oilfield located in southern Iraq is 400 thousand barrels per day.

Under the phase 2 development plan, new production and injection wells will be drilled. Additionally, the project will see construction and launching of oil treatment, storage and transportation facilities along with gas treatment and power generation facilities.
Lukoil revealed that it has closed contracts to drill 57 production wells till date, out of which 54 wells are to be drilled at Mishrif formation while the remaining three wells are to be drilled at Yamama formation.

The Russian energy giant, in a statement said: “To deliver the project Lukoil uses an approach to cluster drilling which envisages erection of two drilling rigs at one well pad. This approach is new for Iraq and will provide for significant field development speed up and production growth within the shortest time.”
The company plans to employ more than 500 Iraqis, living in proximity to West Qurna-2 field, for the drilling campaign.

The onshore Iraqi field, which is located 65km north-west of Basra, is believed to be one of the largest oil fields in the world with nearly 14 billion barrels of initial recoverable reserves. According to Lukoil, more than 90% of the reserves in the onshore oil field are concentrated in Mishrif and Yamama accumulations.

Upstream operations in drilling and producstion are on the brink of disruptive change, with bigger, better data, improved decision making and innovative developments increasing exponentially.
Download the complementary report here
Simply put, this is a must-read report for data driven professionals across the upstream industry.


Lukoil and Statoil were awarded a contract for the development of Iraqi onshore field. A year later, the Russian firm signed a services contract for the development and production of the onshore oilfield for a period of 25 years, which was ratified by the Iraqi Cabinet of Ministers.
First oil from the West Qurna-2 field was produced in March 2014.

https://www.compelo.com/energy/news/lukoil-west-qurna-2-field-driling/
GirlBye
GirlBye
VIP Member
VIP Member

Posts : 706
Join date : 2018-07-09
Location : So Cal

Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum