Dinar Daily
Welcome to Dinar Daily Discussions.

Logging in with your USERNAME allows you to participate in discussions, see what has recently been posted, and other options. Guests can post but they do have limited abilities.

We are NOT a guru forum. We are a dinarian forum. The opinions expressed on the forum do not reflect the of opinion of Dinar Daily specifically, but rather reflect the views of the individual posters only.

Disclamer:

We are in compliance with, "Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use."


Key Words
Adam Montana, AdminBill, Benjamin Fulford, Currency Exchange, David Schmidt, Dinar, Dinar Guru, Dinar Recaps, Dinar Rv, Dinar Scam, Dr Clarke, Frank26, Gary Larrabee, Gurus, Guru Hunters, JerzyBabkowski, Kaperoni, Kenny, Monetary Reform, Mnt Goat, My Ladies, Okie, Poppy, RamblerNash, Ray Renfrow, Redenomination, Revaluation, Ssmith, TNTBS, Tnt Tony, WING IT, We Are The People, Willis Clark, WSOMN, Yosef, Zap

VIDEO: O&M excellence in Iraq from Weir Oil & Gas

Post new topic   Reply to topic

Go down

VIDEO: O&M excellence in Iraq from Weir Oil & Gas

Post  GirlBye on Sun Oct 21, 2018 12:56 pm




Integrated Maintenance Pays off in Middle East
Weir helps one of the world’s largest oil and gas producers achieve lower costs and maximum productivity.


Solution

To help improve reliability and enhance profitability, Weir provided a customized service contract.
More than 100 employees contracted for planned, unplanned, and corrective maintenance at the customer’s plant and facilities in Iraq.
Scope of work included mechanical, pipeline, instrumentation, and electrical services.
Maintenance contract covered well pads, oil-gathering systems, water intake, water pipeline, distribution networks, and substations.
All services supported by direct access to Weir engineering and manufacturing expertise.

Results
After two and a half years, there was not a single maintenance-related performance issue, despite high production volume.
Availability of the plant maintained at maximum—99.7%.
Costs optimized by double digits; nearly 10,000 on-the-job training hours granted, resulting in large number of local employees.
Maintenance programs optimized to increase intervals and reduce costs.

In Iraq, Weir helps one of the world’s largest oil and gas producers achieve lower costs and maximum productivity.

Situation
In the Republic of Iraq, one large oil and gas company was producing a half million barrels per day. The sheer volume posed many operational and economic challenges, including a lack of predictability.
avatar
GirlBye
VIP Member
VIP Member

Posts : 666
Join date : 2018-07-09
Location : So Cal

View user profile

Back to top Go down

Back to top


 
Permissions in this forum:
You can reply to topics in this forum